Project: Hospital
Location: Derby
Completion: Summer
2003
The architect faced difficulties in providing safe access,
while at the same time allowing for water pipes to be routed
along a narrow area of roof. Problems were further compounded
because of different roof levels. Roof-Pro Ltd technical sales
worked closely with the architects, services consultants & M&E
sub-contractors (based in several geographic locations) to
give a bespoke solution that utilises the steel support frame
beneath the access platform to support pipe work to be installed
at a later date. Roof Pro stretched Pod supports were also
installed for 2 no. 2.5 tonne chiller units. Roof Pro carried
out several site surveys to detail bespoke products.
Roof-Pro Products: RP stretched
Pods 18x4T / RP P 18x2T pipe supports (various widths from
600mm to 1000mm / Tab P 500 and several custom access platforms.
|