Project: Hospital
Location: Manchester
Completion: Spring 2003
Roof finish: Single
Ply PVC membrane over a concrete block & beam roof
Roof Pro technical sales attended design meetings with the
hospital facilities management team and their external design
consultants to determine the most appropriate, economical range
of frames to suit various building services equipment (including
Ahu’s weighing 1.67 tonnes). Plant is installed on a
new single ply PVC flat roof directly above a new CT Scanner
Suite. Because Roof Pro support frames are supplied factory
pre assembled (and therefore do not require any on site welded
or drilling), on-site noise was also reduced. It is vital the
Scanner Suite remains operational and so decommissioning plant
to fix any leaks is not an option.
Products: RP Pods 18x36T / 18x24T
/ RP PF1&2 18x4T/ PP3 3040 /RPD500 -750 & 1000 18x2T
/ Tab P 500 - 750 & 1000 / RoofNek.
|