|
Project: University theatre
Location: Leeds
Completion: Autumn 2002
Roof finish: Asphalt
A bespoke step & landing assembly designed to reach a
target height for access through a new doorway leading out
from a internal stairway on to a low level roof. Roof Pro technical
sales site surveyed the project and manufactured the assembly
to include two sizes of vertical leg. The product is being
used primarily for maintenance access purposes and being freestanding
it can be moved easily should the roof require attention now
or in future. The width of the assembly and position of handrails
were specifically designed to match a new door opening.

Roof-Pro Products: Custom RP
Stair & Platform Assembly.
|