Project: Call Centre

Location: Leeds

Completed: 2001

Roof finish: Felt

Typical example showing the removal of a leg and base assembly using Roof-Pro’s Extending Jack Leg.

Spring tongues located in the end of the Extending Jack Leg top beam are positioned into the end of the 50mm x 50mm galvanised box section of the PF support frame, once inserted they are locked-off using twin T- bolts. The base / leg is then adjusted down to the roof to take up the pressure being imposed on the existing leg. The frame base / leg can then be easily removed simply by unbolting the gusset bracket bolts. Once removed the weatherproofing membrane can be accessed to allow either repair or renewal. If the roof datum increase in future (as a result of extra insulation being installed), there is more than sufficient adjustment of the threaded stud in each leg.

The building services equipment did not have to be decommissioned, costs were therefore kept to a minimum and there was no disruption for the building owner

For more information or to arrange a demonstration please contract Roof Pro technical sales.